Crafting a Winning Pricing Strategy: Lump Sum, GMP, & Cost-Plus

10th August 2025

For UK-based SME contractors, developing a robust pricing strategy is critical to winning public sector contracts. A well-structured price not only improves your competitiveness but also helps maintain profitability and manage delivery risk. With frameworks and tenders becoming more price-sensitive, understanding different pricing models is essential. In this article, we examine three core approaches to pricing construction bids in the UK: Lump Sum, Guaranteed Maximum Price (GMP), and Cost-Plus. Each model offers distinct advantages and potential risks depending on the scope, stage, and complexity of a project.

Lump Sum Contracts: Cost Certainty for Defined Scope

A lump sum contract in the UK involves providing a fixed price for the entire project, based on complete and clearly defined specifications. This model is commonly used in public sector tenders for new builds or well-scoped refurbishments.

Advantages:

  • Provides the client with cost certainty from the outset
  • Simplifies project budgeting and funding allocation
  • Encourages contractors to manage their costs efficiently

Risks:

  • Any unforeseen conditions or changes in scope are typically at the contractor’s expense
  • Tendering requires comprehensive project information and accurate cost estimation

Use Case: A local authority tendering for the construction of a new primary school with full planning, design, and specifications completed. The lump sum model would offer the client budget assurance and align with public procurement requirements for fixed-cost delivery.

Cost-Plus Contracts: Flexibility During Uncertain Scope

In a cost-plus contract, the contractor is reimbursed for actual costs incurred (labour, materials, plant, etc.), plus an agreed-upon fee, usually a fixed percentage or lump sum.

Advantages:

  • Reduces risk for contractors in projects with incomplete designs or complex refurbishment needs
  • Encourages early contractor involvement
  • Allows work to begin while design development continues

Risks:

  • Less cost certainty for the client, which may require rigorous monitoring and open-book accounting
  • May reduce the contractor’s incentive to control costs unless structured carefully

Use Case: A heritage building restoration project where the scope of internal works can’t be fully defined until strip-out begins. A cost-plus approach enables flexibility while preserving transparency for the client.

Guaranteed Maximum Price (GMP): Hybrid of Control and Flexibility

A Guaranteed Maximum Price (GMP) contract combines the flexibility of a cost-plus model with the cost control of a lump sum. The contractor is reimbursed on a cost-plus basis up to an agreed cap, beyond which they absorb the financial risk.

Advantages:

  • Offers clients assurance that costs will not exceed a maximum figure
  • Retains flexibility during design development
  • Encourages shared savings mechanisms and collaborative working

Risks:

  • Requires precise documentation of allowable costs and contingency provisions
  • Overruns above the GMP are borne by the contractor, requiring disciplined cost management

Use Case: A council-led housing regeneration project where initial designs are at RIBA Stage 2. A GMP model allows early engagement with a cap on total expenditure, supporting both delivery and budget assurance.

Selecting the Right Approach: Factors to Consider

Choosing between these pricing models depends on several key factors:

Factor Lump Sum GMP Cost-Plus
Design Completion High Medium Low
Budget Certainty High Medium-High Low
Contractor Risk High Medium Low
Flexibility Required Low High High
Project Complexity Low-Medium Medium-High High

When evaluating how to price a construction bid in the UK, consider the client’s procurement expectations, the level of design detail available, and your internal capacity to manage risk and cost transparency.

Practical Tips for SME Contractors

  1. Conduct Detailed Cost Planning: Ensure your estimations are backed by recent cost data, supplier quotes, and realistic productivity rates.
  2. Clarify Assumptions: Always state what is and isn’t included in your price. Clearly outline exclusions, assumptions, and provisional sums.
  3. Understand Contractual Terms: Be clear on the payment mechanism, variation process, and base date implications.
  4. Use Open Book Accounting Where Required: Especially in GMP or cost-plus contracts, prepare to justify costs and maintain transparent records.
  5. Engage Early Where Possible: Many public sector tenders now encourage early contractor involvement under two-stage procurement models.

Conclusion

The choice between lump sum contract UK, GMP vs cost-plus construction, and other pricing strategies can significantly affect your chances of winning work and delivering it profitably. As procurement becomes more outcome-focused, demonstrating your understanding of pricing mechanisms and risk allocation is crucial.

Aligning your pricing model with project complexity, client expectations, and your business’s delivery model is key to long-term success in the public sector market.