For UK-based SME contractors, developing a robust pricing strategy is critical to winning public sector contracts. A well-structured price not only improves your competitiveness but also helps maintain profitability and manage delivery risk. With frameworks and tenders becoming more price-sensitive, understanding different pricing models is essential. In this article, we examine three core approaches to pricing construction bids in the UK: Lump Sum, Guaranteed Maximum Price (GMP), and Cost-Plus. Each model offers distinct advantages and potential risks depending on the scope, stage, and complexity of a project.
A lump sum contract in the UK involves providing a fixed price for the entire project, based on complete and clearly defined specifications. This model is commonly used in public sector tenders for new builds or well-scoped refurbishments.
Advantages:
Risks:
Use Case: A local authority tendering for the construction of a new primary school with full planning, design, and specifications completed. The lump sum model would offer the client budget assurance and align with public procurement requirements for fixed-cost delivery.
In a cost-plus contract, the contractor is reimbursed for actual costs incurred (labour, materials, plant, etc.), plus an agreed-upon fee, usually a fixed percentage or lump sum.
Advantages:
Risks:
Use Case: A heritage building restoration project where the scope of internal works can’t be fully defined until strip-out begins. A cost-plus approach enables flexibility while preserving transparency for the client.
A Guaranteed Maximum Price (GMP) contract combines the flexibility of a cost-plus model with the cost control of a lump sum. The contractor is reimbursed on a cost-plus basis up to an agreed cap, beyond which they absorb the financial risk.
Advantages:
Risks:
Use Case: A council-led housing regeneration project where initial designs are at RIBA Stage 2. A GMP model allows early engagement with a cap on total expenditure, supporting both delivery and budget assurance.
Choosing between these pricing models depends on several key factors:
Factor | Lump Sum | GMP | Cost-Plus |
---|---|---|---|
Design Completion | High | Medium | Low |
Budget Certainty | High | Medium-High | Low |
Contractor Risk | High | Medium | Low |
Flexibility Required | Low | High | High |
Project Complexity | Low-Medium | Medium-High | High |
When evaluating how to price a construction bid in the UK, consider the client’s procurement expectations, the level of design detail available, and your internal capacity to manage risk and cost transparency.
The choice between lump sum contract UK, GMP vs cost-plus construction, and other pricing strategies can significantly affect your chances of winning work and delivering it profitably. As procurement becomes more outcome-focused, demonstrating your understanding of pricing mechanisms and risk allocation is crucial.
Aligning your pricing model with project complexity, client expectations, and your business’s delivery model is key to long-term success in the public sector market.
Ready to sharpen your pricing strategy and secure more public contracts?
Sign up to our portal for exclusive tools, pricing templates, and tailored guidance on how to price your construction bids in the UK.